4 FAST FACTS
1 » The total cost of the project is $46.3 million.
2 » The volume of material to be excavated from the detention
basin is 2.5 million cubic yards. This is the amount of material it would take to fill the Astrodome.
3 » With the proposed project, flooding will decrease
downstream.
4 » The total average annual flood damage reduction benefits
should be approximately $10.8 million.
|
 |
|
Other Flood Damage Reduction Plans for Greens Bayou
On June 24, 1986, Harris County Commissioners Court adopted the Greens Bayou Regional Flood Control Plan
to reduce existing flood damages and to establish costs and guidelines for new developments to offset their
impacts on existing flood levels.
Since 1986, the HCFCD has acquired seven regional detention basin sites in the Greens Bayou watershed
totaling 2,600 acres. Three have been completed or are being excavated. All are scheduled to be complete
or have an initial phase completed in the next five years. Some limited channel rectification has been done
in conjunction with some of the detention basins.
The HCFCD has spent $31 million on these projects since 1986 and expects to spend another $31 million in the
next five years. In addition, the HCFCD has an active voluntary buyout program in association with the
Federal Emergency Management Agency for homes that qualify and have flooded frequently or severely.
|
|
 |
|
 |